Traffic on eight Portland bridges will be affected by Sunday’s Providence Bridge Pedal.
Fremont Bridge: CLOSED upper deck (I-405 southbound) 4 a.m. to noon.
Access to bridge by cyclists ends at 11:30 a.m.
OPEN bottom deck (I-405 northbound) throughout the event.
Broadway Bridge: OPEN both directions.
Steel Bridge: CLOSED eastbound 6:45 a.m. to 12:15 p.m. MAX will be running.
Burnside Bridge: OPEN both directions
Morrison Bridge: OPEN both directions
Lane restrictions 5 – 11 a.m.
Hawthorne Bridge: CLOSED eastbound until 11:30 a.m.
Marquam Bridge: CLOSED upper deck (I-5 northbound) 4 to 11 a.m.
I-5 northbound traffic will be routed to I-405.
OPEN lower deck (I-5 southbound) throughout the event.
Ross Island Bridge: CLOSED westbound 5:30 to 10:30 a.m.